现金真人官方网

Optimal Plan and Design Plan for Plastic Runway

Release Date: 2019-06-06


——Remember the optimal plan and design plan of Jinhan Sports Plastic Runway

Shanghai Jinhan Sports Facility Engineering Co., Ltd. is a high-tech enterprise that mainly engages in research, development, production, sales, and construction guidance of Shanghai Plastic Runway and Epdm Plastic Runway Materials. The product contains silicon PU court, acrylic court, acrylic paint and plastic track materials, etc., is China's most comprehensive sports flooring manufacturer.

Shanghai plastic runway is also called all-weather track and field athletic runway. It consists of polyurethane prepolymer, mixed polyether, rubber, EPDM rubber pellets or PU pellets, pigments, additives and fillers. The Shanghai plastic track has the characteristics of good flatness, high compressive strength, appropriate hardness and elasticity, and stable physical properties, which is conducive to athletes' performance, improves athletic performance, and reduces sports injuries. Together, Shanghai Plastic Runway is excellent in anti-ultraviolet, anti-aging and anti-corrosion. It is recognized as the ideal sports place in the world.

With the continuous development of China's sports, plastic runways are entering more people's days. As a gathering place for a variety of sports, let's look at the optimal plan and design plan for plastic runways!

(I) Competition items:

The IAAF track and field venue equipment standard manual has a standard sports track inner circumference of 400 meters, and the curve radius should be 36.5 meters. The straight track should be in the north-south direction to prevent eye-catching effects when the sun is low. There should be 8 runways in the curve, each with a width of 1.22 meters, and 10 runways in the straight. The safety area inside and outside the runway is not less than 1 meter. The end position of the race should be marked, the position of the obstruction run block pool, and the intersection of the vertical and horizontal axes of the track and field venue.

(2) Throwing events:

The orientation of the high jump area and the pole vault area is generally one for each of the north and south semicircles.

① The discus throwing equipment includes a throwing circle, a cage and a falling area.

② The hammer throwing equipment includes a throwing circle, a cage and a falling area. The discus throw and the hammer throwing circle can be planned by a concentric circle method.

③ Javelin throwing equipment includes a run-off arc throwing area with a radius of 8 meters. Generally planned on the longitudinal axis of the two semicircles of the track and field.

④ Shot put equipment includes throwing circle, toe board and falling area. Shot put areas can be set in a certain semicircle or on the open space of the four corners of the track and field field outside the runway.

(3) Beating project competition place:

① The long and short sand bunkers are symmetrical with each other in the north and south. The two bunkers are separated by 90 ~ 100m with dual-aid runways. The two north-south runways are equipped with long jumps and triple jumps. It is located on the outside of the runway.

② The high jump area includes a semi-circular runway area and landing area. The pole vault area contains a runway assist, hand poles are inserted into the bucket and a landing area.

(IV) Football competition venues: 68m * 105m standard football competition venues are set in the track and field center.

(5) Orientation to be determined:

① The track and field venues have precise positions for the podium and stands.

② Orientation of barbed wire wall around the track and field.

③ The precise position of the inner ring drainage ditch and the outer ring drainage ditch.

④ The orientation of the flagpole on the track and field.
The above is the plastic runway design plan we provide for you. Shanghai Jinhan Plastic Runway Material Construction Engineering Co., Ltd. services include: plastic runway construction project, plastic floor construction project, plastic basketball court laying project, silicon PU court project, kindergarten plastic Runway engineering, raw materials (EPDM, polyurethane glue, silicon Pu) sales services, welcome new and old customers to inquire.



HomeAbout Jinhan Research CenterProductsCase StudyService SupportContact Us
Jinhan Sports Facilities Engineering Co., Ltd. Service area: Shanghai, Suzhou, Nanjing, Ningbo, etc. Jinhan Sports Copyright Copryright © 2003-2018

Address: No. 31, Lane 155, Yingqing Road, Qingpu District, Shanghai National Service Hotline: 15300595992   

15300595992/ 15300595992 Phone: 15300595992/15300595992  

Copyright / Jinhan Sports Plastic Runway Co., Ltd. | Site Map
Customer Service
X

support hotline

15300595992

QQ customer service

Jinhan customer service Jinhan customer service
Jinhan customer service Jinhan customer service

Follow WeChat

WeChat service number

WeChat service number

WeChat subscription number

WeChat subscription number

真钱网赌开户 现金买球真人代理 皇冠ab亚洲馆 正规网赌盘口app代理 真钱滚球网 bet网上赌博网络 真钱滚球平台 澳门盘球网真人 真金赌博网网址 澳门葡京正规娱乐赌城